Boston/ Brookline / Cambridge Commonwealth Ave Bridge Replacement
Boston, MA
MassDOT Project to Replace the Commonwealth Bridge over the Massachusetts Turnpike.
- Installations included:
- Two traffic signal intersections
- 11 New Catenary Poles for the MBTA Green line
- 8 Street Light Poles
- 8 Utility Duct banks consisting of 21,000 FT of Underbridge Fiberglass Conduit.
- Majority of the work was performed during two, two week shutdowns.