Location:
Sudbury, MA
- Renovation of two drug laboratories and one administration space.
- 90-Day complex phasing and scheduling while the drug lab continued to operate.
- Constant integration with state police staff was integral to the successful outcome of the project.
- Installation of complex mechanical systems involved with specialized testing equipment.
- Bomb, Arson, Hydrogen gas system installation.
- Toxicology instrumentation installed.