Featured Projects

Positive Train Control (PTC)

PTC
Scope:


The MBTA Positive Train Control (PTC) project, located throughout the Commonwealth of Massachusetts Commuter Rail System was a 65-million-dollar project that was mandated by the FRA to be completed by December 2020 to have all MBTA commuter rail lines installed with PTC. The installation of PTC included the installation of 4,446 30’ Class 1 Wood Poles, 222 miles of 24 & 48 Strand ADSS Fiber Optic Cable, 184 Antenna Structures and Mast Installation, Installation of 55 – 6 X 8 Bungalow Houses, 29 – 8 x 10 houses that included Wiring the Houses, Installation of 21 Cases, Installation of 524 transponders, and Site Preparation and minor civil work at 84 locations. To complete this project by December 2020, DEC was provided a time sensitive accelerated schedule to comply with. With the time sensitive accelerated schedule in place, DEC was able to complete this project by December 2019.

PTC
PTC-2
PTC-3
PTC-4
PTC-5
PTC-6
PTC-7
PTC-8
PTC-9
PTC-10
PTC-11
PTC-12
PTC-13