Umass Amherst Tillson Substation Project, Installation of a new 115kV to 13.8kV substation suppling power to the campus distribution system.


Installation of three 115kV circuit switchers, two outdoor main
step down 115kV to 13.8kV power transformers, two 13.8kV Power Distribution Centers, two 13.8kV shunt capacitor banks and SCADA system. The Tillson 115kV substation utility connection replaced the existing campus 13.8kV utility connections at two existing 13.8 kV substations and included the installation, splicing, and testing of over 200,000 liner feet of 15 kV cable.